In short

The following are basic guidelines and may require adjustment according to application or installation conditions. Certain specialty cements, such as Flame Guard® FS-5, may have different instructions for specific application conditions. Consult appropriate installation instructions for details.

Initial set schedule

The initial set schedule is the necessary waiting period before handling newly assembled joints. After initial set, the joint will with-stand the stress of a normal installation. In damp or humid weather allow 50% more set time.

  • Average initial set schedule for Spears ® PVC/CPVC solvent cements
Temperature Range Pipe Sizes 1/2″ to 1-1/4″ Pipe Sizes 1-1/2″ to 2″ Pipe Sizes 2-1/2″ to 8″ Pipe Sizes 10″ to 15″ Pipe Sizes 15″+
60°-100°F/16º-38ºC 2 minutes 5 minutes 30 minutes 2 hours 4 hours
40°-60°F/5º-16ºC 5 minutes 10 minutes 2 hours 8 hours 16 hours
0°-40°F/-18º-5ºC 10 minutes 15 minutes 12 hours 24 hours 48 hours

Joint cure schedule

The joint cure schedule is the necessary waiting period before pressurizing newly assembled joints. Follow the schedule carefully. In damp or humid weather or chemical applications & where large reducer bushes are used, allow a minimum of 50% more cure time.

  • Average joint cure schedule for Spears ® PVC/CPVC solvent cements
  • Average number of joints per quart of Spears ® cement
Relative Humidity 60% or Less Cure Time Pipe Sizes 1/2″ to 1-1/4″ Cure Time Pipe Sizes 1-1/2″ to 2″ Cure Time Pipe Sizes 2-1/2″ to 8″ Cure Time Pipe Sizes 10″ to 15″ Cure Time Pipe Sizes 15″+
Temperature range during assembly and cure periods Up to 160 psi

Above 160 to

370 psi

Up to 160 psi

Above 160 to

315 psi

Up to 160 psi

Above 160 to

315 psi

Up to 100 psi

Up to 100 psi

60°-100°F/16º-38ºC 15 min 6 hrs 30 min 12 hrs 1-1/2 hrs 24 hrs 48 hrs 72 hrs
40°-60°F/5º-16ºC 20 min 12 hrs 45 min 24 hrs 4 hrs 48 hrs 96 hrs 6 days
0°-40°F/-18º-5ºC 30 min 48 hrs 1 hour 96 hrs 72 hrs 8 days 8 days 14 days
Pipe Diameter 1/2″ 3/4″ 1″ 1-1/2″ 2″ 3″ 4″ 6″ 8″ 10″ 12″ 15″ 18″
Number of Joints 300 200 125 90 60 40 30 10 5 2-3 1-2 3/4 1/2

Spears® applicator selection guide

For proper solvent cement welding of pipe and fittings, the cement applicator must be no less than half the size of the pipe

Daubers Pipe Diameters
1/4″ 1/2″ 3/4″ 1″ 1-1/4″ 1-1/2″ 2″ 3″
3/8″ Dauber
1/2″ Dauber
5/8” Dauber
3/4″ Dauber
1-1/4″ Dauber
ROLLERS & SWABS SIZE For pipe diameters
3020 3″ Roller 3″ – 6″
6020 4″ Roller 3″ – 8″
7020 7″ Roller 6″ +
5520 4″ Roller 6″ +
6520 6″ Roller 6″ +
4020 4″ Swab 6″ +
5020 4″ Swab 3″ – 8”
4520 4″ Swab 6″ +
Product shelf life
Spears® Products Shelf Life Spears® Products Shelf Life
Primers / Cleaners 3 years CPVC Solvent Cement 2 years
PVC Solvent Cement 3 years ABS Solvent Cement 3 years